We know there are two concrete strength testing methods, such as destructive test method and Non-destructive method.
But both test methods can be applied to concrete cubes only after 28 days because the concrete requires proper curing to gradually attain its ultimate strength, as mentioned in the table below.
SI | Days | Percentage |
1 | Day 1 | 16% |
2 | Day 3 | 40% |
3 | Day 7 | 65% |
4 | Day 14 | 90% |
5 | Day 28 | 100% |
In some special situations, the cube must be tested earlier to know the strength of concrete to proceed with the construction work without delay. The accelerated curing method helps to test and know the strength of the concrete specimen in earlier after concrete casting.
Contents of the Article showUsually, the concrete specimen shall be tested after completion of 28 days of concrete curing activity.
The accelerated curing test is a method of curing concrete specimens to attain its yield strength quickly. So, we can know the 28 days of compressive strength of concrete within a day.
How do you accelerate the curing of concrete?
The acceleration concrete curing can be done by following methods,
We discuss the boiling water method, which is mostly used as an accelerated curing method.
IS code for Accelerated Curing Tank
The specification of the accelerated curing tank has been mentioned in IS code 9013. The curing tank should be made of corrosion-resistant material.
Accelerated Curing Test Apparatus" width="582" height="340" />
The internal size of the curing tank should be accommodating the concrete specimens with sufficient water for immersing. The temperature of curing water should be controllable.
Ra – Crushing value of accelerated concrete cube and the 8.09 is a constant value derived by correlating the test results of normal and accelerated concrete curing methods.
Date | Size of Specimen | Weight in Kgs | Time of water adding to the ingredients | Time of immersion of specimen in curing Tank | Crushing Value | R28 |
Sample 1 | ||||||
Sample 2 | ||||||
Sample 3 |